We made it through it! My husband had to work 14 days straight, with a switch to 2nd shift, and that was hard for the both of us. It has finally come to an end. Now we can get back to our home projects and have the evenings to ourselves.
I literally have several lists going right now. I figured, when this schedule is back to normal, I have options on what we do next, ha ha!
I have been painting the upstairs sub flooring with odor killer paint, and have one room more than half done. We are super excited to get this job done, so we can install flooring. I should the larger room's flooring painted in 3 days, 4 tops.
We have purged many boxes in the last two weeks, donated quite a bit, and our trash bin filled up as fast as it was emptied.
I have just a few more boxes to go through, but they are larger boxes. The bedroom/closet are almost done. We haven't talked much about door paint color yet. We'll pick up paint swatches next trip to town.
On the garden updates:
- planted 16 new asparagus root starts, put short fencing in around to hold straw in place (for now)
-planted about 10 new rhubarb (temporarily in a grow bag)
We are to get 5-6 days of rain starting today. I wanted to get these planted before the rain.
What needs done in the garden:
-dig randomly growing red raspberry sprouts and re-home them, they are coming up in over in the vegetable garden where I have the original asparagus bed.
Gardening indoors:
-planted a basil and cilantro plant, because I have been terrible with seed starts with everything going on here lately.
Leave a comment